THIS HEALTH CARE FACILITY WAS EXPERIENCING EXTENSIVE SETTLEMENT. INTERIOR & EXTERIOR WALLS WERE CRACKING AND FLOORS WERE SLOPPING. CONTINUOUS REPAIRS & ADJUSTMENTS WERE BEING MADE ON DOORS AND WINDOWS.
Ram Jack of TN INSTALLED A TOTAL OF 94 STEEL PIERS TO THE OUTSIDE OF THE BUILDING. THE PIERS REACHED DEPTHS OF 21’ TO 95’ BEFORE HITTING REFUSAL. THE BUILDING WAS LIFTED 1 & 3/16” IN AREA’S WHERE NEEDED. DAILY ACTIVITIES WERE FULLY OPERATIONAL WHILE WORK WAS BEING DONE.